Piper Cheyenne Progressive Inspection 100hr PA-31T2 Part # 761-758

$11.95

Available Options:
Version:

PA-31T2 Part # 761-758

Description

Piper Cheyenne 

PA-31T2

Piper Progressive Inspection/

Piper Operational Inspection

100 Hour Cycle

Part Number 761-758 Issued February 20, 1981 with

revision to March 26, 1997.

The manual is 66 pages long.

 


The Piper Progressive Inspection has the following basic features:

Piper Progressive inspection
The Two -2- Event Inspections
The Special Inspections
The Operational Inspection
The Event Inspection Record and Sign Off Sheet
The Progressive Cycle Inspection Record and Sign Off Sheet
The Discrepancy Record
Service Publication Compliance Record
The Federal Aviation Airworthiness Directives Compliance Record
The ECR – Equipment Change Record
Access Plate and Panel Locations

Additional information

Download Ebook

Download Ebook